Send the complete architectural set
Floor plans alone rarely show every decision. Include elevations, window and door schedules, wall sections and relevant specifications so openings, configurations, handing and finish requirements can be reviewed together.
Build an organized takeoff
A useful takeoff separates windows, entry doors, patio doors and specialty units. It should identify sizes, quantities, operating types, handing, glass, grids, exterior color and interior finish expectations.
Resolve performance requirements early
Design pressure, impact requirements, energy performance and local approvals may affect product availability, configuration and price. These items should be confirmed for the project location before the order is finalized.
Protect the construction timeline
Product series, finishes and custom sizes can carry different lead times. Finalize selections early, confirm required-on-site dates and allow time for plan revisions, approvals and field verification.
Avoid common order delays
- Unconfirmed rough openings or mull configurations
- Missing door handing, swing or sill details
- Color and grid selections that differ across drawings
- Late structural or design-pressure changes
- Incomplete delivery and job-site access information
Final dimensions, code compliance, structural requirements and installation details must be verified by the responsible project professionals before ordering.